Return
Home
Photo
Gallery
The
Boathouse
About
Cooperstown
Who
is AHP?
Contact
Us
Great
Links
Local
Realtors
The
Gazebo
New
Properties

Series Nineteen
     
  Click picture to ZOOM
After all the planning, we finally got started on the Boathouse foundation. In order to provide a solid platform for the structure, it was decided that steel pilings needed to be driven into the bank. The pilings each weigh several thousand pounds. A total of 50 feet of pilings were driven to a depth of 10 feet.

FOR FURTHER DETAILS, CLICK ON THE PICTURES BELOW.


















| Series Twenty-five | Series Twenty-four | Series Twenty-three | Series Twenty-two | Series Twenty-one | Series Twenty | Series Nineteen | Series Eighteen | Series Seventeen | Series Sixteen | Series Fifteen | Series Fourteen | Series Thirteen | Series Twelve | Series Eleven | Series Ten | Series Nine | Series Eight | Series Seven | Series Six | Series Five | Series Four | Series Three | Series Two | Series One | Staircase Photos | Panoramic Views | Canadian Site | Lake Otsego |
| Return Home | Photo Gallery | The Boathouse | About Cooperstown | Who is AHP? | Contact Us | Great Links | Local Realtors | The Gazebo | New Properties |
 
     



Copyright © 2008, llib,inc. All rights reserved.